Power Equipment Subsection
1.Transformer testing
2.Fuse testing
3.Insulator testing
4.On site acceptance test for TPC’s power equipment
Power system analysis, power quality analysis, and high voltage testing
1.Transformer testing
2.Fuse testing
3.Insulator testing
4.On site acceptance test for TPC’s power equipment
1.High voltage withstand voltage on power cable
2.Partial discharge measurement
3.Circuit breaker /GIS testing
4.Testing for Safety protection equipment
5.Calibration of physical quantity in the electric power field
1.Switchgear testing
2.Measurement of electric power quality
3.Maintain the quality management system for high voltage testing section
4.Join witness of on-site type test carried out by the Materials Department of TPC
5.Short-circuit test
6. Review the type test report of TPC's power equipment