Power Equipment Subsection
1.Transformer testing
2.Fuse testing
3.Insulator testing
4.testing of Self-propelled articulated boom lift
5.On site acceptance of Power Equipment
Power system analysis, power quality analysis, and high voltage testing
1.Transformer testing
2.Fuse testing
3.Insulator testing
4.testing of Self-propelled articulated boom lift
5.On site acceptance of Power Equipment
1.Operation and Maintenance Subsection
2.Partial discharge measurement
3.Circuit breaker /GIS testing
4.Testing for Safety protection equipment
5.Calibration of physical quantity in the electric power field
1.Switchgear testing
2.Measurement of Electric power quality
3.Preparation and maintenance of the HV test group quality documents
4.Join witness of on-site type test carried out by the Materials Department